Work is continuing at the church this week, including exterior paint scraping and interior carpentry. The most visible changes are happening outside as excavation is done in preparation for the new entryway.
- Concrete was lifted up,
- pushed together
- And dropped to break into smaller pieces.
- Excavation moved deeper.
- Rocks were loaded in a dump truck.
- Dirt was piled.
- The ground is being prepared for new footings.
- Supports to the exterior steps had to be removed and adapted to support the new entrance.